Relocation of a Mechanical Press in Tychy

Protech Motors completed the relocation of a mechanical press, including its 140-ton press head, at a facility in Tychy, Silesian Voivodeship. The operation was carried out using hydraulic gantries, allowing for the precise and safe relocation of this heavy machine within the facility.

Project Details:

  1. Relocation of the Press Head: The 140-ton press head was efficiently moved using hydraulic gantries, providing stability and control throughout the entire process.
  2. Safe Operation: The use of hydraulic gantries allowed for smooth and safe maneuvering under challenging conditions, enabling the relocation of the equipment without damage and with minimal downtime.

Project Significance: Relocating such a heavy component as the mechanical press head required precise planning and the use of appropriate equipment. Thanks to our experience and advanced technologies, this project was completed in accordance with the highest industry standards, ensuring the smooth operation of the facility.

Our Commitment: At Protech Motors, we focus on modern technologies and safety in every project. Internal relocations, such as this one, require high precision and the right equipment, and our team of specialists is always ready to meet these challenges, delivering efficient and reliable solutions.

 

Hydraulic gantry system moving a heavy mechanical press during relocation at a production facility in Tychy.
Hydraulic gantry system positioning the body of a mechanical press on a transport platform during relocation in Tychy.
Hydraulic gantry system lifting the upper body of a mechanical press during relocation inside a production hall in Tychy.
Hydraulic gantry system positioning the body of a mechanical press on an SPMT platform during relocation inside a production hall.
Hydraulic gantry system moving the heavy body of a mechanical press along transport rails at a production facility in Tychy.
Hydraulic gantry system lifting the upper section of a mechanical press during dismantling and relocation in Tychy.